Construction of a retention reservoir.The subject of the order in part 1 includes construction works at the sewage treatment plant in Zybułtów, commune.Grunwald.The facility is entirely covered with reinforced concrete slabs.Parameters of the designed facility: - total area of the designed facility P = 99.00 m2 - usable area of the designed facility P = 88.00 m2 - cubic capacity of the designed facility V = 88.00 m3 - dimensions: height of the designed facility 1.50 m, width of the designed faci
Tender Details
This tender document contains detailed specifications, requirements, and submission guidelines. Purchase access to view the full document including eligibility criteria, scope of work, and evaluation methodology.
The complete document includes all annexes, terms of reference, and bidding instructions required for your submission.
Contact the procuring entity directly for pre-bid inquiries and clarifications.
Unlock Full Details
Get complete tender information, documents, and contact details.
No account needed · Sent to your email
Get This Tender
Pay once, get this tender sent to your email. No account needed.
Subscribe for time-based access to multiple tenders.
No plans available right now.
Account required for subscriptions
Subscriptions require an account to manage your access and renewal.
Or without signing up