The material scope of the subject of the order includes the construction of a superstructure of dikes/embankments on the S2B section located at the Poznań landfill in Suchy Las, ul.Meteorytowa 1 with a height of 2.00 m and a base width of 10.00 m, the slope slope is 1:2.This will be Stage I of the superstructure of the dikes/embankments.The order includes the superstructure of the existing dikes/embankments in the S2B plot with a height of 2.00 m from the ground, e.g. clay, along with their form
Tender Details
This tender document contains detailed specifications, requirements, and submission guidelines. Purchase access to view the full document including eligibility criteria, scope of work, and evaluation methodology.
The complete document includes all annexes, terms of reference, and bidding instructions required for your submission.
Contact the procuring entity directly for pre-bid inquiries and clarifications.
Unlock Full Details
Get complete tender information, documents, and contact details.
No account needed · Sent to your email
Get This Tender
Pay once, get this tender sent to your email. No account needed.
Subscribe for time-based access to multiple tenders.
No plans available right now.
Account required for subscriptions
Subscriptions require an account to manage your access and renewal.
Or without signing up