Currently, the area to be developed is a rectangular area divided into two sections with different paving material, one section paved with concrete, and the other with soil.There are aerial and underground facilities that will be maintained. The pavement of the ramp and the steps that give access to the new town hall will be demolished, to improve accessibility.The existing wall will be continued with gero and swirled.The ceramic lattice railing will be demolished and replaced with a simple twis

By: City Council of Pontós📍 SpainOpen

Key Information

ReferenceGB-X2026000291
DeadlineOct 5, 2026 12:00 AM
Estimated Value€87,290.00
CategoryAdvertising & Media
Competition TypeICB
Funding SourceSelf-Funded
CountrySpain
AddressSpain
PublishedSep 15, 2026

Description

Currently, the area to be developed is a rectangular area divided into two sections with different paving material, one section paved with concrete, and the other with soil.There are aerial and underg...

Full details are available after unlocking this tender.