Poland – Design and cost estimate documentation for the construction of a road connecting the estate.Kłodnica from the estatePogorzelec with two-way pedestrian and bicycle routes.ReGeneration - Reducing the impact of road transport by diverting traffic from the city center
By: Kędzierzyn-Koźle commune📍 PolandOpen
Key Information
| Reference | GB-786499-2026 |
|---|
| Deadline | Nov 17, 2026 12:00 AM |
|---|
| Category | Advertising & Media |
|---|
| Competition Type | ICB |
|---|
| Funding Source | Self-Funded |
|---|
| Country | Poland |
|---|
| Address | streetGrzegorza Piramowicza 32, Kędzierzyn-Koźle, 47-200, Poland |
|---|
| Published | Nov 12, 2026 |
|---|
Description
2. Procedure2.1.ProcedureTitle: Design and cost estimate documentation for the construction of a road connecting the estate.Kłodnica from the estatePogorzelec with two-way pedestrian and bicycle route...
Full details are available after unlocking this tender.