Italy โ Joint assignment of the executive design, including safety coordination in the design phase, and the execution of the works, on the basis of the PFTE, to be carried out with information modeling techniques (BIM), relating to the intervention called: O.S.122/2025_Earthquake 2016_Adaptation of the road system through demolition of the current reinforced concrete bridge and design
By: SPECIAL OFFICE FOR RECONSTRUCTION MARCHE๐ ItalyOpen
Key Information
| Reference | GB-734719-2026 |
|---|
| Deadline | Nov 25, 2026 12:00 AM |
|---|
| Estimated Value | โฌ12,486,908.91 |
|---|
| Category | Advertising & Media |
|---|
| Competition Type | ICB |
|---|
| Funding Source | Self-Funded |
|---|
| Country | Italy |
|---|
| Address | Via Gentile Da Fabriano n.2/4, ANCONA (AN), 60100, Italy |
|---|
| Published | Oct 23, 2026 |
|---|
Description
2. Procedures2.1.ProceduresTitle: Joint assignment of the executive design, including safety coordination in the design phase, and the execution of the works, on the basis of the PFTE, to be carried o...
Full details are available after unlocking this tender.